Planning notes
Corners and gates each need extra posts; add them manually. Check property lines and local height rules before digging — most codes require locating utilities first.
Posts, rails and pickets for a straight fence run from length, spacing and height.
posts = ceil(length ÷ spacing) + 1 · pickets = ceil(run ÷ (width + gap))
100 ft at 8 ft spacing → 14 posts (incl. one end). At 72 in tall with 5.5" pickets + 0.5" gaps → ~217 pickets.
Corners and gates each need extra posts; add them manually. Check property lines and local height rules before digging — most codes require locating utilities first.
One-third of above-ground height, minimum 24 inches, below frost line where applicable.
Cubic yards or meters of concrete needed for slabs, footings and columns — with bags count.
Gallons of paint for a room from wall dimensions, doors, windows and coat count.
Running cost of any appliance from wattage, hours used and your utility rate.
Number of tiles and boxes for any floor or wall area, including cuts, breakage and pattern waste.
Roof squares and material bundles from footprint area and pitch, with waste factor.
Tons or cubic yards of gravel for driveways and paths, with depth and compaction allowance.