Ordering ready-mix vs bagged
Ready-mix trucks bill by the yard with minimum-load fees; bagged concrete suits small pours under about a yard. An 80 lb bag yields roughly 0.022 yd³ (0.6 ft³), so the bag count climbs fast.
The standard advice holds: never order exactly. A 5–10% buffer covers uneven subgrade, spillage and form flex.